The Capital Subsidy for Industrial Waste based Power Projects will be considered
subject to the following
- The amount of capital subsidy would be calculated on the basis of installed capacity
- Total Capital Subsidy would be limited to Rs. 5.00 crore per projects.
- Subsidy amount will be restricted to 20 % of the project cost.
- In case of ongoing project sanctioned by the Ministry under the existing interest
subsidy scheme, the promoters would be given an option to get the undisbursed CFA
amount adjusted against the loan as one-time support from the Ministry after successful
commissioning of the project. The total CFA amount will be equivalent to the original
sanctioned interest subsidy amount, taking the appropriate discount factor used
in the case of releasing the funds to IREDA / Other FIs / Banks with the provision
that this should not lead to any additional outgo of funds form the Ministry.
- The projects already agreed to ‘in principal’ by the Ministry, but could not be
sanctioned so far, would be considered on merit under the programme.
Capital Subsidy to the Promoters:
Wastes / Processes /Technologies |
Capital Subsidy |
1. Industrial Waste to Biogas
|
|
Biomethanation of low energy density and difficult industrial Wastes (i.e. dairy, tannery, Slaughter house, Sugar(liquid), bagasse wash, textile (liquid), paper (liquid) and pharmaceutical industry).
|
Rs.1.0 crore / MWeq. (12000 Cu.M. biogas per day)
|
Biomethanation of other industrial Wastes.
|
Rs.0.50 crore/ MWeq. (12000 Cu.M. biogas per day)
|
2. Power Generation from Biogas
|
|
Boiler + Steam Turbine Configuration
|
Rs.0.80 crore/MW
|
Biogas Engine /Turbine Configuration
|
Rs.1.00 crore/MW
|
3. Power Generation from Solid Industrial Waste (Boiler + Steam Turbine Configuration)
|
Rs.0.80 crore/MW
|